Readiness Report. Submission scoring
Doc code
RR-LAND-S-2841

Site submission readiness. 84 hectare brownfield parcel, Eastern Province.

Per-submission readiness assessment across the six dimensions infrastructure investors actually evaluate. Submission scored 78 of 100, investment-grade, with three documents flagged as missing for full IC clearance. Sample for illustration.

Prepared for
Site sponsor + CCAV intake team
Prepared at
May 2026
Classification
Sample · For illustration
Sample output. Figures, parties, and identifiers are illustrative. This document is provided to demonstrate the platform's institutional artefact format. Live deliverables follow the same structure with verified data.
01

Score summary

The submission clears the investment-grade threshold of 70 and ranks in the top quartile of land submissions year-to-date. Three documents are flagged as missing for full IC clearance. Closing these gaps would lift the composite score to an estimated 88.

Composite score
78/100
INVESTMENT-GRADE
Strengths: Clean title, MODON pathway, grid connection letter on file, strong PUE design assumptions, water source identified.
Gaps: Environmental Impact Assessment pending. Preliminary geotechnical not on file. Fiber redundancy claim not yet documented.
02

Readiness by dimension

Score breakdown across the six readiness dimensions used by infrastructure investors. Each dimension is independently weighted. Weights are calibrated against historical close-rate data.

DimensionScoreWeightWeightedStatus
Site evidence8220%16.4Strong
Power and grid8825%22.0Strong
Land and permits7020%14.0Good. 2 docs pending
Commercial pathway7615%11.4Good
Sponsor capacity7410%7.4Good
ESG baseline6810%6.8Adequate. EIA pending
COMPOSITE78100%78.0Investment-grade
03

Field-level provenance (top 12 fields)

Every field captured at intake is tagged with its source and a confidence score. This excerpt shows the 12 fields most material to IC review.

FieldValueSourceConfidence
Total land area84 haTitle deed. Govt registry98%
ZoningIndustrial (light)Municipality certificate95%
Grid voltage available380 kVSEC grid letter92%
Grid capacity reserved120 MWSEC grid letter90%
Water sourceTSE pipelineMEWA letter88%
Title encumbranceNoneGovt registry. 30-day fresh97%
Geotechnical surveyIndicative onlySponsor self-attest45%
EIA statusNot startedSponsor self-attest88%
Fiber paths2 carriers claimedSponsor self-attest50%
PUE design1.32Sponsor concept design70%
Soil classType B (medium)Sponsor field walk60%
Distance to grid sub.4.2 kmGIS analysis95%
Confidence note
Fields with confidence below 65% are flagged for verification before this site moves to consortium-assembly stage. The platform uses these confidence scores when ranking submissions in the assembly engine.
04

Document completeness

Documents on file24 of 27 required
Investment-grade threshold22 of 27
IC clearance threshold27 of 27
Pending3 documents (see below)
DocumentRequired atStatusOwner
Title deedIntakeOn file. VerifiedSponsor
Zoning certificateIntakeOn file. VerifiedSponsor
Grid connection letterIntakeOn file. VerifiedSEC
MEWA water letterIntakeOn file. VerifiedMEWA
Preliminary geotechnicalIC clearancePENDINGSponsor
Environmental Impact AssessmentIC clearancePENDINGSponsor + consultant
Fiber-path engineering letterIC clearancePENDINGTelecom partner
05

Benchmarks. Comparable submissions

This submission positioned against the top decile of land submissions in 2025 to 2026 YTD. Higher is better on all dimensions.

DimensionThis sub.Top decileMedianGap to top decile
Site evidence8290648 below
Power and grid8895707 below
Land and permits70926822 below (3 docs)
Commercial pathway7685609 below
Sponsor capacity74885814 below
ESG baseline68855517 below (EIA pending)
06

Recommended next steps

To lift this submission from 78 to investment-grade-with-clearance (estimated 88), close the three pending documents. Estimated effort 6 to 8 weeks. Once cleared, the submission becomes eligible for consortium assembly.

  1. Commission preliminary geotechnical with an approved consultant. Roughly 2 weeks.
  2. Initiate Environmental Impact Assessment pre-scoping with NCEC. Roughly 4 to 6 weeks.
  3. Obtain fiber-path engineering letter from at least one telecom partner. Roughly 1 week.

The platform will surface this submission to the consortium-assembly engine automatically once documents 5 to 7 are uploaded and the composite score crosses 85.